Search Our Project Library

  • Reset
CEB Main Frame: Small Components
Sketchup Model Additional Materials Required: 3/4″ Galvanized Nuts (3) 3/4″ Steel Nuts (2)

CEB: Wide Cylinder Supports
Sketchup Model Additional Materials Required: 3/4″x2″ Bolts (2) 3/4″ Steel Nuts (2) 3/4″ Galvanized Nuts (2)


CEB Soil Grate
Sketchup Model Additional Materials Required: Steel Nuts (2)

CEB: Secondary Arms
Secondary arms act as part of the support structure for machines like the CEB Press.

CEB Shaker Assembly
Sketchup Model Additional Materials Required: Shaker Mount Shaker Motor Shaker Hammer and coupler 1″ Pillow Block Bearings(2) 1/4″x2″ Bolt (1) 3/8″x2″ Bolts (4) 1/2″x2″ Bolts (2) 3/8″ Lock Nuts (4) 1/2″ Lock Nuts (2) 3/8″ Washers (8) 3/8″ Lock Washers (4) 1/2″ Washers (4) 1/2″ Lock Washers (4)

CEB Shaker Hammer and Shaft
Sketchup Model Additional Materials Required: 1″ Keyed Coupler 1/4″x 2″ Bolt


Prepare the Hopper Sheet Metal
Sketchup Model Additional Materials Required: Hinges (12) 1/2″x1″ Bolts (12) 1/2″ Nuts (12) 1/2″ Washers (12)

CEB Hopper Supports and Grate Supports
Hopper Support Model Grate Support Model Additional Materials Required: 3/4″x1.5″ Bolts (2) 3/4″ Nuts (2) Shaker Mount

Restore a Table Lamp
We are restoring old table lamps we had so we can use them now.

CEB Simple Plates
Materials Needed: Steel: .25×2 Flat: 12” (1) – Controller Mount .25×3 Flat: 6”(1) Controller Mount Bottom Piece .25×6 Flat: 12” (1) Valve Mount .25×6 Flat: 15” (1) Controller Mount .125x29x13.5 Sheet (1) Dirt Keeper Plate .125x29x17.5 Sheet (1) Brick Holder Plate Sketchup Model